ECOTEC supplies the lamella system and overflow channels in primary clarifiers of Lagares WWTP in Vigo (Spain). Among the characteristics of the project, the vertical height of the lamella of 1700 mm stands out, This height was chosen due to footprint limitations on the plant. A total of 1.919,05 m3 of lamellas have been installed, corresponding to a total equivalent surface area of 11.991 m2.

 

>> See all news
Este sitio utiliza cookies para mejorar su experiencia de navegación. Si usted continúa navegando, consideramos que acepta el uso de las mismas. OK | Más información